Design of stub girders by Robert Mark Lawson, R. E. McConnel, Steel Construction

By Robert Mark Lawson, R. E. McConnel, Steel Construction Institute (Great Britain)

Show description

Read Online or Download Design of stub girders PDF

Best design books

Sensing the 21st Century City: The Net City Close-up and Remote (Architectural Design November December 2005, Vol. 75, No. 6)

Will towns exist within the subsequent century? Or will far and wide be city? modern communique and transportation networks let for higher city dispersal, but towns proceed to centralise nice densities of actions and thoughts. What shape will the twenty first century urban take? And what function will architects and concrete designers soak up shaping the long run kind of town?

Model Generation in Electronic Design

Version new release in digital layout covers quite a lot of version functions and study. The ebook starts by means of describing a version generator to create part types. It is going directly to talk about ASIC layout and ASIC library new release. This part comprises chapters at the requisites for constructing and ASIC library, a case examine within which very important is used to create this type of library, and the research and outline of the accuracy required in modeling interconnections in ASIC layout.

Design of Demining Machines

In consistent attempt to do away with mine chance, foreign mine motion group has been constructing defense, potency and cost-effectiveness of clearance tools. Demining machines became invaluable whilst carrying out humanitarian demining the place the mechanization of demining presents better safeguard and productiveness.

Additional resources for Design of stub girders

Sample text

Number of shear connectors over jirst stub of length 2050 mm NI = 2050/(95/2) = 44 Longitudinal shear force transfer R4 - 44 x 72 = 3168 kN > R,,, 45 P118: Design of Stub Girders Discuss me ... -- Rev. Job No. 7 kNm. Created on 30 March 2011 This material is copyright - all rights reserved. 4 k N m This exceeds the applied moment. Number of shear connectors over second stub N2 - 76 - 44 = 32 Nominal spacing of shear connectors over central stub, singly at 95 mm spacing N3 - = 10 1000/95 Total number of shear connectors in span - 46 76 X 2 + 10 = 162 P118: Design of Stub Girders Discuss me ...

Table 2: Model factors for different modes of failure in tests MODEL FACTORS’ Created on 30 March 2011 This material is copyright - all rights reserved. Use of this document is subject to the terms and conditions of the Steelbiz Licence Agreement Test No. 75 I Mode of failure Shear failure Longitudinal ofstubsbending failure of shear connectors I I Failure of slab at outer stubs I Notes: 1. Model factor = Failure load / failure load determined from analysis of mode consideredand using measured properties.

Even allowing for this effect, equation (12) appears to under-predict the observed behaviour. Created on 30 March 2011 This material is copyright - all rights reserved. Use of this document is subject to the terms and conditions of the Steelbiz Licence Agreement Only in Test 3 , with simple transverse reinforcement, would BS 5950 and/or the Chien and Ritchie methods appear to he directly applicable. Both methods under-predict the longitudinal shear transfer of the slab. However, calculations (not presented in this report) which included the shear resistance of the slab and reinforcement ahead (that is, on the centre-line side) of the stub, and the transverse tying actionof the secondary beam ahead of the stub, could remove most of the discrepancy shown in Table 3 between predicted and observed behaviour.